About
SUPRAPTO,S.T
EDUCATION
STRATA S1
TEKNIK MESIN
CERTIFICATION
1. WELDING INSPECTOR BNSP-LSP MIGAS
2. RADIOGRAPHY INTERPRETER LEVEL 2
3. MAGNETIC PARTICLE TESTING LEVEL 2
4. DYE PENETRANT TESTING LEVEL 2
WORK EXPERIENCE
PT. AUSTIN ENGINEERING INDONESIA
10 APRIL 2025 – 09 JANUARY 2026
POSITION : QC WELDING INSPECTOR
PROJECT NAME : CATERPILLAR PROJECT
LOCATION : BATAM – KEPRI
PT. VECTOR ENGINEERING INDONESIA
09 JANUARY 2025 – 08 APRIL 2025
POSITION : QC WELDING INSPECTOR
PROJECT NAME : DURATRAY PROJECT
LOCATION : BATAM - KEPRI
PT. AMYTHAS (MANAGEMENT CONSULTANT)
08 OCTOBER 2024 – 27 DECEMBER 2024
POSITION : PIPELINE INSPECTOR
PROJECT NAME : PROYEK PEMBANGUNAN PIPA
TRANSMISI GAS BUMI CIREBON– SEMARANG TAHAP 2
LOCATION : BATANG - CIREBON
PT. BKI (BIRO KLASIFIKASI INDONESIA
25 JUNE 2024 – 31 AUGUST 2024
POSITION : PLANT INSPECTOR (STAT ENG)
PROJECT NAME : RECOVERY CDU IV PROJECT (TURN
AROUND)
LOCATION : PERTAMINA RU V BALIKPAPAN
PT. CBN (CIPTA BANGUN NUSANTARA)
08 JANUARY 2023–24 JUNE 2024
POSITION : LEAD QC / WELDING INSPECTOR
PROJECT NAME : NEW FIRE WATER SYSTEM PROJECT
LOCATION : PUPUK KALTIM BONTANG (PKT)
PT. BBB (BANGUN BEJANA BAJA)
26 SEPTEMBER 2022–17 DECEMBER 2022
POSITION : WELDING INSPECTOR
PROJECT NAME : UPGRADING PIPA PMK
INTEGREATED TERMINAL JAKARTA
LOCATION : PERTAMINA PATRA NIAGA-JAKUT
PT. NSK (NUSAKURA STANDARINDO)
21 JULY 2022–15 SEPTEMBER 2022
POSITION : PLANT INSPECTOR (STAT ENG)
PROJECT NAME : EPC REVITALIZATION PROJECT OF
RU-V (TURN AROUND)
LOCATION : PERTAMINA BALIKPAPAN-KALTIM
PT. CONSORTIUM (ETY YUHANTEC PBAS)
03 JANUARY 2022–30 APRIL 2022
POSITION : INSULATION INSPECTOR
PROJECT NAME : EPC REVITAIZATION PROJECT OF
RCC RU-VI (TURN AROUND)
LOCATION : PERTAMINA BALONGAN-JABAR
PT. SMOE (SUB MARINE OFFSHORE ENGINEERING)
01 JANUARY 2021–15 NOVEMBER 2021
POSITION : QC INSPECTOR
PROJECT NAME : FORMOSA 2 OFFSHORE WIND FARM
LOCATION : INDUSTRIAL KABIL BATAM-KEPRI
PT. CBN (CIPTA BANGUN NUSANTARA)
14 MAY 2015–14 DECEMBER 2020
POSITION : QC COORDINATOR
PROVISION OF HIGH PRESSURE LINE 18” and LOW
PRESSURE LINE 30”PIPELINE INSTALLATION SERVICE
(GEOTHERMAL)
LOCATION : SUPREM RANTAU DADAP-SUMSEL
MODIFICATION FLUID LINE 20” for WELLPAD 2N-2
(GEOTHERMAL)
LOCATION : NAMORA ILANGIT SOL-TAPUT
REPLACEMENT SPOOL 12” CONDENSAT LINE OEC
LOCATION : SILANGKITANG SOL-TAPUT
WELLPAD NIL 3-3 MODIFICATION LINE PIPE 12” and
ROCK CATCHER SUPPORT (GEOTHERMAL)
LOCATION : NAMORA ILANGIT SOL-TAPUT
NIL LINE BRINE COLLECTOR 12” MODIFICATION
(GEOTHERMAL)
LOCATION : NAMORA ILANGIT SOL-TAPUT
MODIFICATION SPOOL PIPE SPARATOR A & B
(GEOTHERMAL)
LOCATION : NAMORA ILANGIT SOL-TAPUT
MODIFICATION LINE PIPE 12” WELL HOOK UP
(GEOTHERMAL)
LOCATION : NAMORA ILANGIT SOL-TAPUT
INSTALLATION PIPELINE for WELL TESTING
(GEOTHERMAL)
LOCATION : PLN TULEHU-AMBON
SARULA GEOTHERMAL POWER PLANT
LOCATION : SARULA-TAPUT
REINSTATEMENT WAYANG WINDU PROJECT
(GEOTHERMAL)
LOCATION : WW PANGALENGAN-BANDUNG
PT. PGN SOLUTION
14 MARCH 2014–30 APRIL 2015
POSITION : WELDING INSPECTOR
PROJECT NAME : PEMASANGAN JARINGAN PIPA
DISTRIBUSI
LOCATION : BALOI to BATU AMPAR-BATAM
PT. KRAKATAU ENGINEERING
01 APRIL 2013–28 FEBRUARY 2014
POSITION : WELDING INSPECTOR
PROJECT NAME :
PEMASANGAN JARINGAN PIPA TRANSMISI
LOKASI : PANARAN to TANJUNG UNCANG
PT. MEGA PETRO SYNERGI
13 JUNE 2012–23 MARCH 2013
POSITION : QC/WELDING INSPECTOR
PROJECT NAME : GORGON LNG JETTY PROJECT
LOCATION : HANJUNG-BANDAR LAMPUNG
PT. ARAFI KARYA 38
10 FEBRUARY 2012–25 MAY 2012
POSITION : WELDING INSPECTOR
PROJECT NAME :
NCIG PROJECT
LOCATION : HANJUNG -BANDAR LAMPUNG
PT. BINTAN OFFSHORE
19 SEPTEMBER 2011–18 DECEMBER 2011
POSITION : QC INSPECTOR
PROJECT NAME : BLOCK of JACKUP RIG NEW
BUILDING
LOCATION : KIJANG-TANJUNG PINANG
PT. FUJITEC INDONESIA
13 SEPTEMBER 1992–10 FEBRUARY 2010
POSITION : QC INSPECTOR
PROJECT NAME : ELEVATOR LTC & CARCAGE
PROJECT
LOCATION : MUKA KUNING -BATAM